Sunday, March 18, 2007

Close-out left tank, other stuff

01 Aug 2006: all of us, 4 hours each. Closed out the left and leak checked. Didn't have a balloon so we used a neoprene glove. This seemed to work OK, but we will repeat with a balloon next time to be sure. Also worked on a reinforcement plate for the relocated sender on the right tank. We installed the final left outboard aileron bracket, and studied the installation instructions for the Gretz heated pitot tube we bought at AirVenture.

0 Comments:

Post a Comment

<< Home