Sunday, March 18, 2007

Install flap/aileron gap fairings, other stuff

03 Aug 2006: two of us, 4 hours each. We repeated the leak test of the left tank with a balloon, and it still passed. We installed the flap and aileron gap fairings. We prepared the rudder brace for cutting and drilling.

0 Comments:

Post a Comment

<< Home