Once again various projects
31 Aug 2006: all of us, 4 hours each. Made 5/16" spacers to replace the incorrect ones and primed them. Greased the bellcrank and control stick bushings. Torqued all bolts attaching left tank to main spar and marked with torque-seal. Installed nutplates for Gretz heated pitot control panel. Installed nut-inserts to hold trap door and flop tube bracket to ribs inside right fuel tank. Began prepping right control stick.
0 Comments:
Post a Comment
<< Home