Pitot, control rod tunnel, tank stuff
10 Oct 2006: all of us, 4 hrs each. Riveted pitot tube bracket nut plates, fit pitot tube into bracket, and installed tubing in wing for pitot. Fabricated the control rod tunnel. Prepared right fuel tank for tank sealant.
0 Comments:
Post a Comment
<< Home