Sunday, March 18, 2007

Elevator bellcrank, tank stuff, etc.

12 Sep 2006: all of us, 3 hours each. Prep work on elevator pushrod bellcrank (match-drilled, fabriacted spacers, primed, etc.). Fitted fuel level float for right tank, and continued working on routing out the spacer washer to clear pre-existing rivet heads. Also removed the F705G angles and F757 plates that were installed by the factory, since we are doing the slider canopy. We will have to modify the F757 plates accordingly.

0 Comments:

Post a Comment

<< Home